Inventory planners
Set practical stock policies using demand and lead-time evidence.
Manufacturing Planning Tools
Calculate gross material demand, available supply, shortages and recommended order quantities from production and inventory data.
Upload material demand and stock data to calculate gross demand, net requirement and recommended order quantity.
Upload a CSV or Excel file to begin.
Business context
Production demand does not translate directly into a purchase quantity. Existing stock, open orders, safety stock, BOM usage, scrap and timing must be considered together to avoid both shortages and unnecessary buying.
This guidance is designed for people who need to use material requirements planner results in a real approval, planning or operational workflow.
Set practical stock policies using demand and lead-time evidence.
Identify slow, excess and high-priority stock for action.
Protect availability while controlling working capital.
Input guide
| Column | Purpose | Example |
|---|---|---|
| Material * | Purchased or manufactured component identifier. | RM-205 |
| Production Demand * | Planned finished quantity for the period. | 1000 |
| BOM Quantity * | Material required per finished unit. | 1.5 |
| Current Stock * | Verified available on-hand quantity. | 620 |
| Open PO * | Confirmed supply due within the planning horizon. | 400 |
| Safety Stock * | Required projected buffer after demand. | 150 |
| Scrap % * | Expected material loss. | 2 |
Mapping note: Use consistent dates, currencies, units and definitions. A correct calculation based on inconsistent inputs can still lead to a poor decision.
Use the analysis as a controlled decision-support step: prepare reliable data, review the exceptions, verify the cause and document the action taken.
Clean the source data and confirm the required fields and reporting period.
Run the tool and prioritise the most important material requirements results.
Validate the cause with contracts, transactions and operational evidence.
Assign actions, export the report and measure improvement in the next cycle.
Decision support
These actions are practical review priorities. Apply your organisation's approval limits, tolerance rules and contractual requirements.
Immediate
Start with records that have the greatest financial, service or operational effect. Confirm the source data before taking action.
Next
Separate genuine performance or demand movement from data quality, timing, unit, currency and process issues.
Monitor
Run the analysis on a consistent schedule, record decisions and compare whether corrective actions improve the next period.
Practical examples
The same result can require a different response depending on product criticality, shelf life, contract terms, service impact and available alternatives.
A production increase creates a shortage after safety stock is protected.
Expected outcome: The planner confirms lead time and releases only the net requirement.
An open order will arrive after the scheduled batch date.
Expected outcome: The supply is not treated as available and the production date or procurement action is revised.
Material requirements planning translates production demand and BOM usage into time-sensitive purchasing or production needs after considering stock, open orders, safety stock and expected scrap.
No. Supported CSV and Excel analysis runs locally in your browser.
No. It is transparent decision support for analysis and planning. Confirm results against approved masters, transactions and schedules.
Use consistent units for quantities, time and cost. Convert pack, weight, length and machine-time units before comparing or rolling up values.
Review after meaningful demand, price, BOM, routing, yield, capacity or inventory changes and during the normal planning cycle.